Yes, a registered PoA can continue including new VPAs/CPAs as per the approved inclusion criteria in the registered PoA-Design Document (i.e. against the previous RE eligibility rules) until the next renewal of the PoA. At that time, the inclusion criteria for new VPAs/CPAs must be updated in line with the new eligibility rules as defined in Renewable Energy Activity Requirements, paragraph 2.1.3

 

Any new VPAs/CPAs included as per the previous rules can continue until the end of their respective maximum allowed crediting period.